There are two options for migrating from Checklists for Jira Data Center to Checklists for Jira Enterprise (cloud):
-
Jira Cloud Migration Assistant (JCMA) recommend
-
Direct import (if your Jira work items have already been migrated to the new Cloud instance)
Due to differences between Jira Data Center and Jira Cloud, the checklist apps offer similar functionality but may achieve that functionality in different ways. Comparable features are available, but there is not 100% feature parity.
Jira Cloud Migration Assistant (JCMA)
Restarting a migration does not always replace checklist data from an earlier run. On the Import page in Cloud, under Migration settings, Clear the data imported by earlier runs of the same migration removes data from earlier runs of that same migration only. Data from a different migration plan is not removed. To replace everything previously imported from Data Center, including data from other plans, use the manual import and turn on Clear previously imported data.
How to Prepare for Migration
-
Verify the scope of each Checklist Custom Field Context. Set the context to the individual projects where that checklist definition applies. Select All projects only when the definition applies to every project. A context set to All projects puts that checklist on work items in every project after the migration, including projects where the field was not shown on the screens in Data Center.
-
Include, in one migration plan, every project whose checklist definitions and checklist items you need in Cloud.
-
Add each project that uses a checklist definition. A definition is exported only when its context is All projects, or includes at least one project in the plan.
-
Add each project whose work items carry checklist items. Checklist items are exported only for work items that belong to a project in the plan.
-
Add the projects to the plan when you need checklist items on work items. A plan with no projects exports only the definitions whose context is All projects, and no checklist items. The assistant still reports the migration as complete.
Keep every project of one definition in the same plan. Splitting them merges those projects into one global checklist, and work items in the projects you leave out do not receive checklist items.
-
-
Record the checklist data the migration does not carry over, and restore it after the migration:
-
Re-assign checklist items after the migration. Jira Cloud uses different user IDs from Data Center, so assignees are not migrated.
-
Restore due dates on checklist items after the migration. Due dates are not migrated.
-
Treat items that came from a template as local checklist items. Items already applied to work items in Data Center are imported. The templates themselves are not.
-
Recreate each checklist template in Cloud. Templates from Data Center are not imported.
-
Unarchive every project and work item you need to migrate, then archive them again afterwards. The migration skips archived projects and work items.
In the (Source) Data Center Instance
-
Ensure that you are using Checklists for Jira Data Center version 7.2.12.11 or later. Earlier versions do not support the current Cloud migration.
-
The export can take many hours on a large instance, because it walks every work item that has checklist values. Keep the Data Center database stable while it runs. A short loss of the database connection can stop the export without an error, and the assistant then reports the app migration as complete.
-
Install the Jira Cloud Migration Assistant app.
-
Turn on logging for the Checklist for Jira export before you start, so that if the export stops we can see which field and work item it was processing.
-
In Jira Data Center, go to Administration > System > Logging and profiling.
-
Under Configure logging level for another package, enter
com.okapya.jira, select INFO, and click Add. -
If Jira runs as a cluster, repeat this on every node. The setting applies only to the node you set it on, and it resets when Jira restarts, so set it again after any restart.
This adds about one log line per exported work item, so make sure there is enough disk space. After the migration, set the package back to WARN.
-
-
Navigate to admin.atlassian.com. Select the appropriate Organization. Click on the … menu to the right of the appropriate App and select Manage app. Click on Connected apps from the left nav bar. Scroll to the Checklists for Jira click View app details. Confirm that the version is
7.2.12.11or later and that the app key iscom.okapya.jira.checklist.
In the (Destination) Cloud Instance
-
Install the Checklist for Jira Enterprise app.
-
Navigate to admin.atlassian.com. Select the appropriate Organization. Click on the … menu to the right of the appropriate App and select Manage app. Click on Connected apps from the left nav bar. Scroll to the Checklists for Jira click View app details. Confirm that the version is
2.0.0or later and the app key iscom.okapya.jira.checklist. -
Verify that the projects you will be migrating do not already exist in the Cloud instance.
Executing the Migration
-
In the source instance, navigate to System and select Migrate to cloud from the left nav bar.
-
Enter your Administrator password when prompted.
-
On the Connect to Cloud page, use the dropdown to select the destination cloud instance. If the dropdown is empty or the target instance is not shown, click Choose cloud site. You will be given the option to attach an existing cloud instance or create a new cloud instance.
-
Click Continue.
-
The Migration Assistant home page will open. Scroll down to Assess your apps and click Begin assessing.
-
Verify that the spaces being migrated include at lease one Checklist Definition. Then, on the list of apps, find Checklist for Jira. In the status dropdown, select Needed in cloud.
If you are migrating in batches and none of the spaces in a given batch include Checklist Definitions that should be imported in total to the Cloud, please select Not needed in cloud in the status dropdown.
A plan whose projects include no checklist definitions uploads no checklist data. The Jira Cloud Migration Assistant still reports the app migration as complete. Check the Import page of Checklist for Jira in Cloud. That page shows whether definitions and checklist items on work items actually arrived.
-
Make the appropriate selection for any other apps. Click Done.
-
Scroll down to Prepare your apps and click Continue preparing.
-
Click Confirm to accept the privacy policy of the cloud app. Click Done.
-
Follow the JCMA instructions for migrating users and email domains.
-
Scroll to Migrate your data and click Create a migration.
-
You may be shown the screen below; this is totally optional. To avoid it in the future, tick the “Don’t show me this screen again” box.
-
Name the migration.
-
Select the migration stage (testing or production).
-
Select the destination cloud instance.
-
Select Choose what to migrate.
-
Under Projects, click Select.
-
Use the checkboxes to select the spaces(s) you want to migrate. The app will check that the spaces do not already exist on the cloud site.
-
Make the appropriate selections for migrating Boards, User & Groups, JSM customers, etc. Click Run pre-migration checks.
-
Click Review migration.
-
After confirming that the migration will include the correct data, click Run.
Note that in the Cloud App, global and local items are separated into two different checklists: A work item that had a checklist with both global and local items in the Data Center version will have two different checklists (global and local) in the Cloud version.
Following the migration in Cloud
The Jira Cloud Migration Assistant can report the app migration as complete even when the export stopped early or sent no checklist data. When the migration ends, open Checklist for Jira in Jira Cloud and go to Import > Jira Cloud Migration Assistant.
-
Check the status. Finished means the data we received was imported. Finished with gaps means some work item keys from Data Center were not found in Cloud, so those work items did not receive checklist items. Failed means the export stopped before every expected definition arrived; the page shows how many arrived.
-
Compare Global checklists created with the number of checklist contexts that apply to the projects in the plan, including contexts for all projects.
-
Compare Issues matched and Issues with imported checklists with the work items that had checklists in those projects. 0/0 means no checklist items were exported. That usually means the plan did not include the projects those work items belong to.
-
Open a few migrated work items from different projects and confirm that their checklist items are there.
If the migration does not look right
Do not cancel the migration, start it again, or start a manual import before contacting support. Cancelling a migration that is in progress can change the projects and work types a global checklist applies to.
Send all of the following in one reply, as soon as you can. Log files rotate, and older files are deleted.
-
From every Data Center node,
atlassian-jira.logandatlassian-jira-migration.log, including the rotated files (atlassian-jira.log.1,.2, and so on). A support zip that includes the application logs is fine. -
The migration plan name, the projects included in it, and the start and end times with the time zone.
-
Screenshots of the app migration in the Jira Cloud Migration Assistant, and of the Checklist for Jira Import page in Cloud.
-
Anything that happened to the Data Center database or Jira during the export: a restart, a failover, a lost connection, or a disk space alert.
Manual import, if the assistant migration cannot finish
Checklist data can also be migrated without the assistant. The manual export from Data Center does not depend on which projects a migration plan includes.
-
In Data Center, export the checklist data for the checklist custom fields, following Exporting/importing checklist data to Cloud. Keep the exported
customfield_<number>-<number>-<number>.gzfiles as they are. Do not rename or unzip them. -
In Cloud, go to Checklist for Jira > Import > Checklist for Jira Server/DC and upload all of the files. If that tab says the import is not available, contact support and we will enable it.
-
Turn on Clear previously imported data. This removes data from earlier manual imports and from assistant migrations, so nothing is duplicated. Checklist content that did not come from an import is not affected.
-
Leave Import data only as local checklists off, so the definitions are created as global checklists, as they are in an assistant migration.
-
Click Start import and follow the progress on that page. Do not start another import until it has finished.
Work items are matched by work item key, so they must already exist in Cloud with the same keys as in Data Center. Keys that are not found are listed in the import results.
Post-migration Configurations
Once the migration is complete:
-
Navigate to Jira Settings > Marketplace apps and select Global Settings under the Checklists for Jira Enterprise to review the following:
-
Global Settings – Ensure your global settings are properly configured. (If checklists are not shown on the main work item panel, enable the Show empty checklist panel in work items setting.)
-
Global Checklists – Review your global checklists. You may want to adjust the Checklists context.
-
Permissions – Review checklist permissions.
-
Statuses – Verify that any custom statuses migrated correctly.
-
-
Checklist for Jira Enterprise creates several custom fields. However, since Jira Cloud does not support a checklist custom field type, your previous checklist custom fields will not have been migrated. Therefore it is recommended that you review places other than the work item panel where you were using these fields, and replace them with the new custom fields created by the cloud app:
-
Automation rules
-
Board cards
-
Create and transitions screens
-
Workflow conditions, post functions, rules and validators
-
-
Checklist templates are not included in the import and will need to be recreated. (However, checklist items from templates applied in the Data Center instance will have been imported as local items.)
-
Default local checklist items are not supported in cloud. However, you can accomplish the same thing using a default template.
-
Checklist item assignees – Jira Cloud creates different user IDs than Jira Data Center. Currently, after verifying that all of your users were successfully migrated to cloud, you will need to re-assign checklist items.
-
Due dates on checklist items do not import and will need to be restored.
We’ve worked hard to make your migration easy, but if you run into any trouble your Enterprise subscription comes with priority support including discovery meetings, demo calls and guided support.
An error can occur if you cancel a JCMA import in progress. Please see this page before canceling an import.
Direct Import
How to Prepare for Migration
Checklists for Jira Data Center
-
Verify the scope of each Checklist Custom Field Context. Ensure that the Context is only marked as “All Projects” for checklists that you truly want to have on all of your Jira work items. (When using checklists Data Center you may have set the Context to “All Projects,” but omitted the Checklist Custom field on screens in certain spaces. When migrating to Cloud, this can result in useless data being stored in the database, and unwanted checklists appearing on Jira work items.)
-
Some items will need to be verified/reconfigured post-migration. Therefore, you may want to prepare an inventory of:
-
Global items - Once migration is complete, you may want to create Global Checklists that include these items.
-
Checklist permissions
-
Checklist conditions
-
Checklist validators
-
Checklist post functions
-
Assigned checklist items - depending on the migration path you used, user IDs may or may not have been mapped from Data Center to cloud. Therefore, once users are set up in Cloud you will need to re-assign checklist items.
-
Due dates on checklist items
-
Checklist for Jira on-prem templates are not imported, however checklist items created on those templates are imported to Jira work items as local checklist items. You can create Templates in Checklists for Jira Cloud, but the existing templates from your Data Center instance will not be imported. You may want make a list of existing templates so you recreate them in the cloud instance once the migration is complete.
-
-
Follow the instructions on this page to create the export file.
Checklist for Jira Enterprise
We recommend preparing your data first and waiting until you are ready to migrate before starting a trial of Checklists for Jira Enterprise, as the trial is for a limited time.
Executing the Migration
-
Install Checklists for Jira Enterprise.
Before you start:
-
Jira will not be impacted by the migration. However, there will be some downtime during which you will not be able to access your checklist data.
-
The importer for Checklists for Jira Data Center is available in Checklists for Jira Enterprise and will load all checklist data files created by the Checklists for Jira Export feature and copy them to the Checklists for Jira Enterprise app.
-
Checklists for Jira Enterprise works differently than Checklists for Jira Data Center. Learn more here.
-
Use the Checklists for Jira Export feature to generate the files that will be loaded into work item Checklist.
-
Navigate to Jira Settings > Marketplace apps and select Import under the Checklists for Jira Enterprise heading.
-
Select the Checklists for Jira Server/DC tab.
-
Locate the files generated during the Checklist for Jira Data Center export process and drag them to the upload area. Alternatively, you can click the area and select the files from your computer.
-
When all the files generated during the Export process are in the list, click Upload files.
-
By default, Global Checklist items on the on-prem instance will be imported as Global Checklists in the cloud instance. However, you can choose to import them as local (specific to the Jira work item). If you choose this option, no Global Checklists will be created by the import.
-
Determine if you want to overwrite or append to previously imported checklists. The import process is designed to allow for incremental imports, and does not prevent duplicates. If you perform an import without enabling Clear previously imported data, any previously imported items may appear as duplicates in subsequent imports. Use the Clear previously imported data toggle to indicate if you want to:
-
Clear previously imported data (Toggle enabled)
Replace previously imported data with the items in the files you uploaded. Turn this on if you import more than once. This removes data imported earlier by the Jira Cloud Migration Assistant as well as data from earlier manual imports. Checklist content that did not come from an import is not affected. Data replaced includes:-
Global Checklists
-
Checklist items in Jira work items (global and local)
-
Checklist item statuses
Please see the troubleshooting imports page for more information.
-
-
Append imported checklist items to already existing checklists (Toggle disabled)
Imported checklist items will be appended to the existing checklist(s) on the work item. If you will import the same checklist Checklist Field but for other space(s), duplicate Global Checklist will appear. It’s recommended to import a checklist Custom Field configuration for all spaces at once.
-
-
Once the files are uploaded, and you’ve confirmed that the Clear previously imported data toggle is in the correct position, click Start import. The import will be scheduled and a gray panel will show the import status. Click on the Refresh icon to update the status.
-
When the import is complete, the status panel will turn green and will display the number of checklist items and work items impacted.
The import is a gradual process. Checklist data will become available in the database and visible in the UI as it’s imported. However, we recommend waiting to work on checklists until the import is finalized.
If you need to cancel and restart the import, be sure to enable the Clear previously imported data in Checklist for Jira Enterprise toggle.
Please contact our support with any questions.
Note that in the Cloud App, global and local items are separated into two different checklists: an work item that had a checklist with both global and local items in the Data Centerversion will have two different checklists (global and local) in the Cloud version.
Post-migration Configurations
Once the migration is complete:
-
Navigate to Jira Settings > Marketplace app and review the following:
-
Global Settings – Ensure your global settings are properly configured. (If checklists are not shown on the main work item panel, enable the Show empty checklist panel on work items setting.)
-
Global Checklists – Review your global checklists and their contexts. If the context did not migrate, please contact support.
-
Permissions – Review checklist permissions.
-
Statuses – Verify that any custom statuses migrated correctly.
-
-
Checklist-type custom fields used in your Data Center instance are not supported in Jira cloud. If you were using these fields in places other than the work item panel (automation rules, board cards, create and transition screens, workflow behaviors, etc.), you will need to replace those custom fields with the custom fields created by Checklists for Jira Enterprise.
-
Checklist templates are not included in the import and will need to be recreated. (However, checklist items from templates applied in the Data Center instance will have been imported as local items.)
-
Default local checklist items are not supported in cloud. However, you can accomplish the same thing using a default template.
-
Checklist item assignees – After verifying that all of your users were successfully migrated to cloud, you may need to re-assign checklist items on local checklists. Mentions/assignees are not supported in Global Checklists.
-
Due dates on checklist items do not import and will need to be restored.
We’ve worked hard to make your migration easy, but if you run into any trouble your Enterprise subscription comes with priority support including discovery meetings, demo calls and guided support.